/ PROJECTS

image

Tunnels highway A8 (Vizcaya, Spain)

Stretches: Amorebieta-Muxica, Peñacastillo-Cacicedo, Parbayón-Cacicedo, S. Salvador de las Heras-Parbayón and Zurita-Parbayón. Validation of tunnels
image

Working shafts main collector «La Reguera»

for jacking of pipe 1800 mm diameter
More

Other tunnels

- Design and analysis of a 700 m long tunnel, 2.4 m in diameter, for sewage collection to La Chira wastewater treatment plant, Lima , Perú.

- Design of the penstock tunnel for La Miel II hydroelectric power station, Colombia

- Design of four inter-jack stations to allow the jacking of 4 km long pipe, 1.8 m in diameter, for the Móstoles sewage system, Spain.

- Design and analysis of a hydraulic tunnel under Valdemoro train station for the sewage network, Madrid, Spain.

- Design and analysis of a hydraulic tunnel under Balcón de Coimbra housing estate in Madrid, Spain